Multiple Lane Closures, Rolling Blocks for Work on I-10 Mississippi River Bridge
The Louisiana Department of Transportation reports that beginning July 11, crews will conduct an inspection on the I-10 Mississippi River (Horace Wilkinson) Bridge in the Capitol Region. Inspections will occur daily from 6:00 a.m. to 2:30 p.m. from Monday, July 11, to Saturday, July 30, weather read more…
The article: Multiple Lane Closures, Rolling Blocks for Work on I-10 Mississippi River Bridge, was originally published on I-10 Exit Guide